|
Client: BALFOUR BEATTY Construction of new railway station platform, coupled with refurbishment of existing platform and alterations to existing car park facilities.
Client: LAING O’ROURKE Lineside routeworks and cabling as part of the GSM-R scheme.
Client: ALSTOM Construction of concrete driver walkways, CET slabs and low level lighting.
Client: BIRSE RAIL Two miles of safe cess walkway constructed alongside the west coast main line.
Client: MURPHY RAIL A variety of mast and equipment bases and associated routeworks. A range of in-situ concrete and helical screwed piled solutions offer maximum flexibility.
|