Photo: hard hat

Alstom Traincare Facility, Oxley

Client: ALSTOM
Construction of concrete driver walkways, CET slabs and low level lighting.

Click image to open!
Click image to open!
Click image to open!

Working in a busy train care depot, Story Rail installed over 1000m of concrete driver walkways and installed a street lighting system including a mix of floodlights, bollards and recessed lights to allow train drivers to safely work in the sidings. A power supply was installed from an existing signal box to run the lighting system and specially designed GRP crossing points were installed to link the walkways over the running lines.